Cath Kidston Selfridges Concession
Cath Kidston opened their concession within Selfridges on Oxford Street in July 2011. The programme for the project was limited and allowed a lead time of two weeks for the manufacture of all bespoke units. The site installation was completed over a two week period and included the strip out of the existing concession, the installation of a new random width board engineered oak floor, lighting, and decoration to include the Cath Kidston Wallpaper and Tiles. The project was completed on time to our client.





